Site construction at Preferred Freezer Services in Richland, Washington

Layout the site and begin excavation for the 80′ Rice Lake OTR Truck Scale

pr2

Finish excavation of pit. Compact ground and layout and set floor forms.

pr3

Install drainage and rebar, pour the floor by the end of the day.

pr4

Strip forms from floor and set wall forms.

pr5

  

pr8

Day 7: Pour walls

pr9

Strip Forms from walls and prepare for scale structure to be installed

IMG_20150422_091558

Scale structure, galvanized pan, manholes, and rebar installed.  Rebar reinforcement along the traction pattern has been tied in place.

IMG_20150424_104138

IMG_20150424_104201

The concrete is poured to finish the scale, the ramps are formed up and poured, and the concrete scale deck is prepared to cure.

Concrete Final

Final paving and electronics installation is completed

014530728085a7caffef9950152ee031f566ab911c